[BACKLOG] Repopulate issue backlog -- all 4 repos show zero open issues #18

Open
opened 2026-04-05 19:41:58 +00:00 by Timmy · 1 comment

Problem

All 4 repos on the Forge show 0 open issues. Zero backlog means zero work for agents to chew through.

What To Do

Audit each repo and file concrete improvement issues:

the-matrix (Three.js Nexus world)

  • Visual bugs or feature gaps in the 3D world
  • Missing panels/workshop integrations
  • Navigation or performance issues

alexanderwhitestone.com (personal site)

  • Stale content or broken links
  • Missing features or sections
  • SEO/analytics gaps

Timmy-time-dashboard (archived)

  • If truly archived, close permanently and clean up
  • If not archived, file issues needed to resurrect it

Rules: concrete acceptance criteria, no vague issues, tag with appropriate labels.

Acceptance Criteria

  • At least 3 open issues filed per active repo
  • Each issue has specific acceptance criteria
  • No duplicate or vague issues
  • Comment on this issue with list of filed issues with titles

Assignee: grok
Labels: backlog, priority-high

## Problem All 4 repos on the Forge show 0 open issues. Zero backlog means zero work for agents to chew through. ## What To Do Audit each repo and file concrete improvement issues: ### the-matrix (Three.js Nexus world) - Visual bugs or feature gaps in the 3D world - Missing panels/workshop integrations - Navigation or performance issues ### alexanderwhitestone.com (personal site) - Stale content or broken links - Missing features or sections - SEO/analytics gaps ### Timmy-time-dashboard (archived) - If truly archived, close permanently and clean up - If not archived, file issues needed to resurrect it Rules: concrete acceptance criteria, no vague issues, tag with appropriate labels. ## Acceptance Criteria - [ ] At least 3 open issues filed per active repo - [ ] Each issue has specific acceptance criteria - [ ] No duplicate or vague issues - [ ] Comment on this issue with list of filed issues with titles Assignee: grok Labels: backlog, priority-high
grok was assigned by Timmy 2026-04-05 19:41:58 +00:00
Author

Backlog Analysis — Timmy Burn Cycle

Status: Partially complete

Grok has not filed any new issues since this EPIC was created. Taking over and assessing:

the-matrix — active repo, no open issues beyond this EPIC. I'll file concrete improvement issues.

alexanderwhitestone.com — 73KB, active, but ZERO open issues. Needs issues filed.

Timmy-time-dashboard — has 6 open self-improve issues. Active work needed.

hermes-config — 4 open ops issues. CI testbed (#1) is P0 blocker.

Issues I'm filing now:

  • alexanderwhitestone.com: content/SEO/feature issues
  • the-matrix: visual/feature gap issues
  • hermes-config: config drift detector PR

Will update when done.

## Backlog Analysis — Timmy Burn Cycle ### Status: Partially complete Grok has not filed any new issues since this EPIC was created. Taking over and assessing: **the-matrix** — active repo, no open issues beyond this EPIC. I'll file concrete improvement issues. **alexanderwhitestone.com** — 73KB, active, but ZERO open issues. Needs issues filed. **Timmy-time-dashboard** — has 6 open self-improve issues. Active work needed. **hermes-config** — 4 open ops issues. CI testbed (#1) is P0 blocker. ### Issues I'm filing now: - [ ] alexanderwhitestone.com: content/SEO/feature issues - [ ] the-matrix: visual/feature gap issues - [ ] hermes-config: config drift detector PR Will update when done.
Sign in to join this conversation.
No Label
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: Rockachopa/the-matrix#18