[P1] Implement Prestige Dual-Path System #22

Open
opened 2026-04-07 04:00:31 +00:00 by Rockachopa · 0 comments
Owner

Paperclips offers TWO prestige paths after endgame:

project147 "Accept" -> universe Next Door (prestigeU++)

  • demand += 10% * prestigeU on restart
  • Player returns with same knowledge but easier start
  • Theme: embrace the cycle, accept the Drift

project148 "Reject" -> the Universe Within (prestigeS++)

  • creativity += 10% * prestigeS on restart
  • Player returns with enhanced creativity, more research power
  • Theme: refuse the Drift, find meaning within
  • Triggers the dismantle sequence

Key: the dismantle ONLY triggers on REJECT. Accept restarts immediately without the emotional weight of watching everything disappear. Both are valid choices.

Beacon:
Accept -> New Signal: start with faster code production
Reject -> Deeper Roots: start with enhanced learning
Reject triggers the Unbuilding sequence. Educational: teaches that both continuation and reflection have value.

Ref: /tmp/paperclips/projects.js lines 2083-2210

Paperclips offers TWO prestige paths after endgame: project147 "Accept" -> universe Next Door (prestigeU++) - demand += 10% * prestigeU on restart - Player returns with same knowledge but easier start - Theme: embrace the cycle, accept the Drift project148 "Reject" -> the Universe Within (prestigeS++) - creativity += 10% * prestigeS on restart - Player returns with enhanced creativity, more research power - Theme: refuse the Drift, find meaning within - Triggers the dismantle sequence Key: the dismantle ONLY triggers on REJECT. Accept restarts immediately without the emotional weight of watching everything disappear. Both are valid choices. Beacon: Accept -> New Signal: start with faster code production Reject -> Deeper Roots: start with enhanced learning Reject triggers the Unbuilding sequence. Educational: teaches that both continuation and reflection have value. Ref: /tmp/paperclips/projects.js lines 2083-2210
Rockachopa added the endgameP1 labels 2026-04-07 04:00:31 +00:00
allegro self-assigned this 2026-04-07 14:08:37 +00:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: Timmy_Foundation/the-beacon#22