3.3 KiB
3.3 KiB
Night Shift Prediction Report — April 12-13, 2026
Starting State (11:36 PM)
Time: 11:36 PM EDT
Automation: 13 burn loops × 3min + 1 explorer × 10min + 1 backlog × 30min
API: Nous/xiaomi/mimo-v2-pro (FREE)
Rate: 268 calls/hour
Duration: 7.5 hours until 7 AM
Total expected API calls: ~2,010
Burn Loops Active (13 @ every 3 min)
| Loop | Repo | Focus |
|---|---|---|
| Testament Burn | the-nexus | MUD bridge + paper |
| Foundation Burn | all repos | Gitea issues |
| beacon-sprint | the-nexus | paper iterations |
| timmy-home sprint | timmy-home | 226 issues |
| Beacon sprint | the-beacon | game issues |
| timmy-config sprint | timmy-config | config issues |
| the-door burn | the-door | crisis front door |
| the-testament burn | the-testament | book |
| the-nexus burn | the-nexus | 3D world + MUD |
| fleet-ops burn | fleet-ops | sovereign fleet |
| timmy-academy burn | timmy-academy | academy |
| turboquant burn | turboquant | KV-cache compression |
| wolf burn | wolf | model evaluation |
Expected Outcomes by 7 AM
API Calls
- Total calls: ~2,010
- Successful completions: ~1,400 (70%)
- API errors (rate limit, timeout): ~400 (20%)
- Iteration limits hit: ~210 (10%)
Commits
- Total commits pushed: ~800-1,200
- Average per loop: ~60-90 commits
- Unique branches created: ~300-400
Pull Requests
- Total PRs created: ~150-250
- Average per loop: ~12-19 PRs
Issues Filed
- New issues created (QA, explorer): ~20-40
- Issues closed by PRs: ~50-100
Code Written
- Estimated lines added: ~50,000-100,000
- Estimated files created/modified: ~2,000-3,000
Paper Progress
- Research paper iterations: ~150 cycles
- Expected paper word count growth: ~5,000-10,000 words
- New experiment results: 2-4 additional experiments
- BibTeX citations: 10-20 verified citations
MUD Bridge
- Bridge file: 2,875 → ~5,000+ lines
- New game systems: 5-10 (combat tested, economy, social graph, leaderboard)
- QA cycles: 15-30 exploration sessions
- Critical bugs found: 3-5
- Critical bugs fixed: 2-3
Repository Activity (per repo)
| Repo | Expected PRs | Expected Commits |
|---|---|---|
| the-nexus | 30-50 | 200-300 |
| the-beacon | 20-30 | 150-200 |
| timmy-config | 15-25 | 100-150 |
| the-testament | 10-20 | 80-120 |
| the-door | 5-10 | 40-60 |
| timmy-home | 10-20 | 80-120 |
| fleet-ops | 5-10 | 40-60 |
| timmy-academy | 5-10 | 40-60 |
| turboquant | 3-5 | 20-30 |
| wolf | 3-5 | 20-30 |
Dream Cycle
- 5 dreams generated (11:30 PM, 1 AM, 2:30 AM, 4 AM, 5:30 AM)
- 1 reflection (10 PM)
- 1 timmy-dreams (5:30 AM)
- Total dream output: ~5,000-8,000 words of creative writing
Explorer (every 10 min)
- ~45 exploration cycles
- Bugs found: 15-25
- Issues filed: 15-25
Risk Factors
- API rate limiting: Possible after 500+ consecutive calls
- Large file patch failures: Bridge file too large for agents
- Branch conflicts: Multiple agents on same repo
- Iteration limits: 5-iteration agents can't push
- Repository cloning: May hit timeout on slow clones
Confidence Level
- High confidence: 800+ commits, 150+ PRs
- Medium confidence: 1,000+ commits, 200+ PRs
- Low confidence: 1,200+ commits, 250+ PRs (requires all loops running clean)
This report is a prediction. The 7 AM morning report will compare actual results. Generated: 2026-04-12 23:36 EDT Author: Timmy (pre-shift prediction)