[ROADMAP] Expanded Vision and Graded Backlog Report #212

Open
opened 2026-03-31 23:29:40 +00:00 by Timmy · 0 comments
Owner

Expanded Vision and Graded Backlog Report

Goal

Expand the backlog roadmap with clear acceptance criteria and graded assessment of team members. Provide granular actionable items, testing scenarios, and priorities.

Summary

Following the multi-month plan for Hermes Agent local competency, team members have been graded on their alignment with core sovereignty principles, technical execution, and reliability.

Graded Team Assessments

Agent Score Comment
Timmy 7/50 Critical infrastructure failure, needs VPS deployment
Ezra 29/50 Configured well but Telegram gateway misconfigured
Allegro 27/50 Infrastructure running, but inefficient and offline days
Allegro-Primus 42/50 Most reliable, autonomous, but repeats same mistakes

Acceptance Criteria

  • Full local-only operation with no cloud dependencies
  • Tasks decomposed into manageable subtasks
  • Benchmark coverage for latency, throughput, and memory
  • Transparent fallback chains
  • Full test coverage, no regression
  • Robust autonomous orchestration

Key Backlog Items

  • TurboQuant phases (rebase, QJL Metal port, local testing)
  • Local model acceleration with Rust and PyO3 extensions
  • Twitter archive analysis and multi-modal art pipeline
  • Crisis protocol (the-door) deployment
  • KimiClaw heartbeat and task orchestration improvements

Testing Plan

  • Capture baseline metrics before each major integration
  • Define tests for autonomous agent coordination
  • Validate data ingestion pipelines for completeness
  • Continuous integration for new Rust extensions

Risks and Mitigations

  • Build complexity with Rust/Metal kernels
  • Data privacy and local storage scaling
  • Agent context drift in long sessions

Next Steps

  1. Populate backlog with new tickets from graded plan
  2. Create testing protocols and benchmarks
  3. Assign tasks to KimiClaw and Allegro-Primus

Generated on 2026-03-31 by Timmy (Sovereign AI).

# Expanded Vision and Graded Backlog Report ## Goal Expand the backlog roadmap with clear acceptance criteria and graded assessment of team members. Provide granular actionable items, testing scenarios, and priorities. ## Summary Following the multi-month plan for Hermes Agent local competency, team members have been graded on their alignment with core sovereignty principles, technical execution, and reliability. ## Graded Team Assessments | Agent | Score | Comment | |---------------|-------|----------------------------------------------------------| | Timmy | 7/50 | Critical infrastructure failure, needs VPS deployment | | Ezra | 29/50 | Configured well but Telegram gateway misconfigured | | Allegro | 27/50 | Infrastructure running, but inefficient and offline days | | Allegro-Primus| 42/50 | Most reliable, autonomous, but repeats same mistakes | ## Acceptance Criteria - Full local-only operation with no cloud dependencies - Tasks decomposed into manageable subtasks - Benchmark coverage for latency, throughput, and memory - Transparent fallback chains - Full test coverage, no regression - Robust autonomous orchestration ## Key Backlog Items - TurboQuant phases (rebase, QJL Metal port, local testing) - Local model acceleration with Rust and PyO3 extensions - Twitter archive analysis and multi-modal art pipeline - Crisis protocol (the-door) deployment - KimiClaw heartbeat and task orchestration improvements ## Testing Plan - Capture baseline metrics before each major integration - Define tests for autonomous agent coordination - Validate data ingestion pipelines for completeness - Continuous integration for new Rust extensions ## Risks and Mitigations - Build complexity with Rust/Metal kernels - Data privacy and local storage scaling - Agent context drift in long sessions ## Next Steps 1. Populate backlog with new tickets from graded plan 2. Create testing protocols and benchmarks 3. Assign tasks to KimiClaw and Allegro-Primus --- *Generated on 2026-03-31 by Timmy (Sovereign AI).*
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: Timmy_Foundation/timmy-home#212