LAB-007 — Grid Power Hookup Estimate Request Packet

No formal estimate has been received yet. This packet turns the issue into a contact-ready request while preserving what is still missing before the utility can quote real numbers.

Utility identification

Site details currently in packet

  • Site address / parcel: [exact cabin address / parcel identifier]
  • Pole distance: [measure and fill in]
  • Terrain: [describe terrain between nearest pole and cabin site]
  • Requested service size: 200A residential service

Missing information before a real estimate request can be completed

  • site_address
  • pole_distance_feet
  • terrain_description

Estimate request checklist

  • pole/transformer
  • overhead line
  • meter base
  • connection fees
  • timeline from deposit to energized service
  • monthly base charge
  • per-kWh rate

Call script

  • Confirm the cabin site is in Eversource's New Hampshire territory for Lempster.
  • Request a no-obligation new-service estimate and ask whether a site visit is required.
  • Provide the site address, pole distance, terrain, and requested service size (200A residential service).
  • Ask for written/email follow-up with total hookup cost, monthly base charge, per-kWh rate, and timeline.

Draft email

Subject: Request for new electric service estimate - Lempster, NH cabin site

Hello Eversource New Service Team,

I need a no-obligation estimate for bringing new electric service to a cabin site in Lempster, New Hampshire.

Site address / parcel: [exact cabin address / parcel identifier]
Requested service size: 200A residential service
Estimated pole distance: [measure and fill in]
Terrain / access notes: [describe terrain between nearest pole and cabin site]

Please include the following in the estimate or site-visit scope:
- pole/transformer
- overhead line
- meter base
- connection fees
- timeline from deposit to energized service
- monthly base charge
- per-kWh rate

I would also like to know the expected timeline from deposit to energized service and any next-step documents you need from me.

Thank you.

Honest next step

Once the exact address / parcel, pole distance, and terrain notes are filled in, this packet is ready for the live Eversource new-service request. The issue should remain open until a written estimate is actually received and uploaded.