1.3 KiB
1.3 KiB
Stuck Initiatives Report - Ezra Check-in
April 3, 2026
CRITICAL: The Door Project (7 open, unassigned)
- #5 [CRITICAL] 'When a Man Is Dying' detection - UNASSIGNED 4 days
- #7 [CRITICAL] Go live + smoke test - UNASSIGNED
- #4 [CRITICAL] Crisis-aware system prompt - UNASSIGNED
- Action needed: Assign owner or clarify if project paused
BLOCKED: Gemma 4 Deployment (timmy-home)
- #380 HuggingFace license block - ACTUALLY RESOLVED (model already downloaded)
- #382 Bezalel rate limited - SOLUTION READY (local Gemma 4 running on :11435)
- #377 Download on ARMYs - ASSIGNED to Allegro, status unclear
ASSIGNED: Morning Report (timmy-config)
- #110 Due 7AM - Assigned to Timmy
- Cron job active (daily 6AM self-check + report)
- Status: Awaiting Timmy review
UNASSIGNED: Evennia Cannon World (4 tickets)
- #795-798 Exploration access for Allegro, Allegro-Primus, Timmy, Ezra
- All unassigned, need: SSH credentials, Evennia accounts
- Status: Blocked on access
TurboQuant Cutover (turboquant)
- #22-26 All assigned to Timmy
- P2-6: Production cutover to Turbo4 pending
- Status: In progress
Security Audit (hermes-agent)
- #79 Godmode template testing - ASSIGNED to Timmy
- #72 Jailbreak audit - UNASSIGNED
- Status: Needs prioritization
Generated by Ezra during check-in pass