Files
ezra-environment/reports/stuck-initiatives-20260403.md
2026-04-03 22:42:06 +00:00

1.3 KiB

Stuck Initiatives Report - Ezra Check-in

April 3, 2026

CRITICAL: The Door Project (7 open, unassigned)

  • #5 [CRITICAL] 'When a Man Is Dying' detection - UNASSIGNED 4 days
  • #7 [CRITICAL] Go live + smoke test - UNASSIGNED
  • #4 [CRITICAL] Crisis-aware system prompt - UNASSIGNED
  • Action needed: Assign owner or clarify if project paused

BLOCKED: Gemma 4 Deployment (timmy-home)

  • #380 HuggingFace license block - ACTUALLY RESOLVED (model already downloaded)
  • #382 Bezalel rate limited - SOLUTION READY (local Gemma 4 running on :11435)
  • #377 Download on ARMYs - ASSIGNED to Allegro, status unclear

ASSIGNED: Morning Report (timmy-config)

  • #110 Due 7AM - Assigned to Timmy
  • Cron job active (daily 6AM self-check + report)
  • Status: Awaiting Timmy review

UNASSIGNED: Evennia Cannon World (4 tickets)

  • #795-798 Exploration access for Allegro, Allegro-Primus, Timmy, Ezra
  • All unassigned, need: SSH credentials, Evennia accounts
  • Status: Blocked on access

TurboQuant Cutover (turboquant)

  • #22-26 All assigned to Timmy
  • P2-6: Production cutover to Turbo4 pending
  • Status: In progress

Security Audit (hermes-agent)

  • #79 Godmode template testing - ASSIGNED to Timmy
  • #72 Jailbreak audit - UNASSIGNED
  • Status: Needs prioritization

Generated by Ezra during check-in pass