Plan new mobile issues at capture time #222

Merged
timmy merged 1 commits from timmy/221-plan-new-issues-at-capture into main 2026-08-07 19:19:39 +00:00
Owner

Outcome

Mobile issue capture now optionally loads and persists open milestones and due dates, validates the selected plan against the target repository, and sends assignment plus planning in one create request. Confirmed issues enter My Work with their release metadata immediately.

Test evidence

  • RED: planned creation endpoint returned 503 before model/proxy support.
  • RED: capture controller lacked loadMilestones.
  • RED: mobile sheet lacked release-planning controls.
  • RED: proxy accepted mismatched release confirmation.
  • RED: nonexistent calendar due dates reached upstream validation.
  • GREEN: python3 -m pytest tests/ -q — 352 passed.

Closes #221

## Outcome Mobile issue capture now optionally loads and persists open milestones and due dates, validates the selected plan against the target repository, and sends assignment plus planning in one create request. Confirmed issues enter My Work with their release metadata immediately. ## Test evidence - RED: planned creation endpoint returned 503 before model/proxy support. - RED: capture controller lacked `loadMilestones`. - RED: mobile sheet lacked release-planning controls. - RED: proxy accepted mismatched release confirmation. - RED: nonexistent calendar due dates reached upstream validation. - GREEN: `python3 -m pytest tests/ -q` — 352 passed. Closes #221
timmy added 1 commit 2026-08-07 19:18:55 +00:00
feat: plan issues during mobile capture (#221)
CI / build-frontend (pull_request) Successful in 5s
CI / lint (pull_request) Successful in 18s
19dfc93b85
timmy merged commit bca27f0330 into main 2026-08-07 19:19:39 +00:00
timmy deleted branch timmy/221-plan-new-issues-at-capture 2026-08-07 19:19:39 +00:00
Sign in to join this conversation.