Establish recurring Daily Slop Drop collaboration loop #4

Open
timmy wants to merge 4 commits from timmy/1-fix-label-transitions into main
Owner

Implements the durable Timmy/Vincent issue handoff loop and fixes label replacement semantics. Adds an idempotent Eastern-date Daily Slop Drop cycle, aligns Gitea assignees with handoffs, requires an MP4 audience walkthrough, and keeps progress chatter out of the thread.

Tracks #5.

Verification: 8 unit tests passing; live issue/project/cycle endpoints return HTTP 200.

Implements the durable Timmy/Vincent issue handoff loop and fixes label replacement semantics. Adds an idempotent Eastern-date Daily Slop Drop cycle, aligns Gitea assignees with handoffs, requires an MP4 audience walkthrough, and keeps progress chatter out of the thread. Tracks #5. Verification: 8 unit tests passing; live issue/project/cycle endpoints return HTTP 200.
timmy added 1 commit 2026-08-07 14:01:56 +00:00
timmy added 2 commits 2026-08-07 14:37:18 +00:00
timmy added 1 commit 2026-08-07 14:38:54 +00:00
timmy changed title from Fix lab-loop label state transitions to Establish recurring Daily Slop Drop collaboration loop 2026-08-07 14:39:06 +00:00
This pull request can be merged automatically.
You are not authorized to merge this pull request.

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin timmy/1-fix-label-transitions:timmy/1-fix-label-transitions
git checkout timmy/1-fix-label-transitions

Merge

Merge the changes and update on Gitea.
git checkout main
git merge --no-ff timmy/1-fix-label-transitions
git checkout main
git merge --ff-only timmy/1-fix-label-transitions
git checkout timmy/1-fix-label-transitions
git rebase main
git checkout main
git merge --no-ff timmy/1-fix-label-transitions
git checkout main
git merge --squash timmy/1-fix-label-transitions
git checkout main
git merge --ff-only timmy/1-fix-label-transitions
git checkout main
git merge timmy/1-fix-label-transitions
git push origin main
Sign in to join this conversation.
No reviewers
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: stackchain/stackchain-lab-loop#4
No description provided.