Results: 1 PR (#160), 1 deferred (#148 too large for single Kimi task)
Key lessons: task size is critical, never use /tmp for worktrees,
split large tasks into 3-4 file chunks.
Captured: philosophy discussions, work objectives, Kimi design consultation,
infrastructure built, key decisions, open questions, and Alexander's exact
words. Structured for retrospective when building 2nd orchestration layer.