5.9 KiB
5.9 KiB
Fleet SITREP — April 6, 2026
Classification: Consolidated Status Report Compiled by: Ezra Acknowledged by: Claude (Issue #143)
Executive Summary
Allegro executed 7 tasks across infrastructure, contracting, audits, and security. Ezra shipped PR #131, filed formalization audit #132, delivered quarterly report #133, and self-assigned issues #134–#138. All wizard activity mapped below.
1. Allegro 7-Task Report
| Task | Description | Status |
|---|---|---|
| 1 | Roll Call / Infrastructure Map | ✅ Complete |
| 2 | Dark industrial anthem (140 BPM, Suno-ready) | ✅ Complete |
| 3 | Operation Get A Job — 7-file contracting playbook pushed to the-nexus |
✅ Complete |
| 4 | Formalization audit filed (the-nexus #893) | ✅ Complete |
| 5 | GrepTard Memory Report — PR #525 on timmy-home |
✅ Complete |
| 6 | Self-audit issues #894–#899 filed on the-nexus |
✅ Filed |
| 7 | keystore.json permissions fixed to 600 |
✅ Applied |
Critical Findings from Task 4 (Formalization Audit)
- GOFAI source files missing — only
.pycremains - Nostr keystore was world-readable — FIXED (Task 7)
- 39 burn scripts cluttering
/root— archival pending (#898)
2. Ezra Deliverables
| Deliverable | Issue/PR | Status |
|---|---|---|
| V-011 fix + compressor tuning | PR #131 | ✅ Merged |
| Formalization audit (hermes-agent) | Issue #132 | Filed |
| Quarterly report (MD + PDF) | Issue #133 | Filed |
| Burn-mode concurrent tool tests | Issue #134 | Assigned → Ezra |
| MCP SDK migration | Issue #135 | Assigned → Ezra |
| APScheduler migration | Issue #136 | Assigned → Ezra |
| Pydantic-settings migration | Issue #137 | Assigned → Ezra |
| Contracting playbook tracker | Issue #138 | Assigned → Ezra |
3. Fleet Status
| Wizard | Host | Status | Blocker |
|---|---|---|---|
| Ezra | Hermes VPS | Active — 5 issues queued | None |
| Bezalel | Hermes VPS | Gateway running on 8645 | None |
| Allegro-Primus | Hermes VPS | Gateway DOWN on 8644 | Needs restart signal |
| Bilbo | External | Gemma 4B active, Telegram dual-mode | Host IP unknown to fleet |
Allegro Gateway Recovery
Allegro-Primus gateway (port 8644) is down. Options:
- Alexander restarts manually on Hermes VPS
- Delegate to Bezalel — Bezalel can issue restart signal via Hermes VPS access
- Delegate to Ezra — Ezra can coordinate restart as part of issue #894 work
4. Operation Get A Job — Contracting Playbook
Files pushed to the-nexus/operation-get-a-job/:
| File | Purpose |
|---|---|
README.md |
Master plan |
entity-setup.md |
Wyoming LLC, Mercury, E&O insurance |
service-offerings.md |
Rates $150–600/hr; packages $5k/$15k/$40k+ |
portfolio.md |
Portfolio structure |
outreach-templates.md |
Cold email templates |
proposal-template.md |
Client proposal structure |
rate-card.md |
Rate card |
Human-only mile (Alexander's action items):
- Pick LLC name from
entity-setup.md - File Wyoming LLC via Northwest Registered Agent ($225)
- Get EIN from IRS (free, ~10 min)
- Open Mercury account (requires EIN + LLC docs)
- Secure E&O insurance (~$150–250/month)
- Restart Allegro-Primus gateway (port 8644)
- Update LinkedIn using profile template
- Send 5 cold emails using outreach templates
5. Pending Self-Audit Issues (the-nexus)
| Issue | Title | Priority |
|---|---|---|
| #894 | Deploy burn-mode cron jobs | CRITICAL |
| #895 | Telegram thread-based reporting | Normal |
| #896 | Retry logic and error recovery | Normal |
| #897 | Automate morning reports at 0600 | Normal |
| #898 | Archive 39 burn scripts | Normal |
| #899 | Keystore permissions | ✅ Done |
6. Revenue Timeline
| Milestone | Target | Unlocks |
|---|---|---|
| LLC + Bank + E&O | Day 5 | Ability to invoice clients |
| First 5 emails sent | Day 7 | Pipeline generation |
| First scoping call | Day 14 | Qualified lead |
| First proposal accepted | Day 21 | $4,500–$12,000 revenue |
| Monthly retainer signed | Day 45 | $6,000/mo recurring |
7. Delegation Matrix
| Owner | Owns |
|---|---|
| Alexander | LLC filing, EIN, Mercury, E&O, LinkedIn, cold emails, gateway restart |
| Ezra | Issues #134–#138 (tests, migrations, tracker) |
| Allegro | Issues #894, #898 (cron deployment, burn script archival) |
| Bezalel | Review formalization audit for Anthropic-specific gaps |
SITREP acknowledged by Claude — April 6, 2026 Source issue: hermes-agent #143