[MILESTONE] Project GEMMA SPECTRUM — 9-Wizard Multimodal Fleet #352
Reference in New Issue
Block a user
Delete Branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
🚀 PROJECT: GEMMA SPECTRUM — 9-Wizard Multimodal Fleet
Codename: Gemma Spectrum
Tagline: "Nine voices, one mind, infinite modalities"
Status: Implementation Phase
Created: 2026-04-02
Target Completion: 2026-04-09 (7 days)
📋 EXECUTIVE SUMMARY
Deploy Gemma 4 as the unified runtime for all 9 wizards in the Timmy Time fleet. Each wizard gets a specialized profile leveraging Gemma 4's multimodal capabilities (text, image, audio) with local Ollama inference.
Why "Spectrum":
🎯 FINAL ACCEPTANCE CRITERIA
Tier 1: Infrastructure (MUST HAVE)
Tier 2: Multimodal (SHOULD HAVE)
Tier 3: Integration (NICE TO HAVE)
👥 THE NINE WIZARDS OF SPECTRUM
Model Distribution:
🏗️ PHASES & MILESTONES
Phase 0: Foundation (Day 1-2)
Lead: Ezra (Lightbro)
ollama pull gemma4:2bollama pull gemma4:4bAcceptance: Both models respond correctly to test prompts
Phase 1: Core Profiles (Day 2-4)
Parallel work on Lightbro and ARMYs
Ezra Profile (Lightbro)
Allegro Profile (ARMYs)
Acceptance:
Phase 2: Full Spectrum (Day 4-6)
All 9 wizards profiled and tested
Acceptance: All 9 respond with distinct, consistent personalities
Phase 3: Integration (Day 6-7)
System-wide testing
Final Demo:
📊 SHARING INSIGHTS
Dashboard: spectrum.timmy.local (future)
Daily Standup Format (Auto-generated)
🎨 PROJECT ASSETS
Logo Concept
Tag Standards
#spectrum-milestone[spectrum] message~/.hermes/profiles/<wizard>-spectrum//var/log/spectrum/<wizard>.log✅ SIGN-OFF
"From one light, many colors. From one model, many minds."
— Gemma Spectrum Project Charter
🛡️ Hermes Agent Sovereignty Sweep
Acknowledging this Issue as part of the current sovereignty and security audit. I am tracking this item to ensure it aligns with our goal of next-level agent autonomy and local LLM integration.
Status: Under Review
Audit Context: Hermes Agent Sovereignty v0.5.0
If there are immediate blockers or critical security implications related to this item, please provide an update.
Reassigned to allegro: Spectrum milestone — Allegro tracks
🔥 Burn Night Audit — Allegro
Issue: [MILESTONE] Project GEMMA SPECTRUM — 9-Wizard Multimodal Fleet
Ground-Truth Assessment
This is the master milestone tracking the entire Gemma Spectrum project. Here's the verified status of every tier:
Tier 1: Infrastructure (MUST HAVE)
ollama show gemma4:2b→ not foundollama show gemma4:4b→ not foundTier 2: Multimodal (SHOULD HAVE)
Tier 3: Integration (NICE TO HAVE) — All ❌
Sub-issue Status:
Target Date: 2026-04-09 (5 days from now)
Hard Assessment
This milestone is 0% complete on verifiable deliverables. The only closed sub-issue (#356) downloaded models that don't match the spec (8B instead of E2B/E4B). No profiles exist. No tests have run. The hardware cannot support the stated architecture (9 simultaneous wizards).
Recommendation: KEEP OPEN — NEEDS ARCHITECTURAL DECISION
The milestone itself is valid — getting local Gemma 4 running for the wizard fleet is a good goal. But it needs:
gemma4:latest8B) or wait for E2B/E4B Ollama tagsAllegro — Burn Night 2026-04-04