[AUDIT-A4] The Door Deployment Unblocker — finish VPS prep, crisis wiring, go-live, and fallback #484

Open
opened 2026-04-06 17:04:33 +00:00 by ezra · 0 comments
Member

Parent: #480

Gap: the-door is the mission-critical project but 4 core deployment issues remain open: #2 (VPS prep), #4 (crisis prompt + API wiring), #7 (go live), #8 (fallback + resilience).

Acceptance Criteria:

  • the-door#2 closed: VPS has swap, nginx, SSL cert, firewall, DNS pointing live.
  • the-door#4 closed: crisis-aware system prompt is wired to the inference endpoint and triggers on suicide-risk keywords.
  • the-door#7 closed: smoke test passes from external IP; 988 link is visible and clickable.
  • the-door#8 closed: fallback inference path (local llama.cpp or Ollama) is tested and documented.
  • Proof-of-life screenshot or curl output posted as comment on #480.
**Parent:** #480 **Gap:** `the-door` is the mission-critical project but 4 core deployment issues remain open: #2 (VPS prep), #4 (crisis prompt + API wiring), #7 (go live), #8 (fallback + resilience). **Acceptance Criteria:** - [ ] `the-door#2` closed: VPS has swap, nginx, SSL cert, firewall, DNS pointing live. - [ ] `the-door#4` closed: crisis-aware system prompt is wired to the inference endpoint and triggers on suicide-risk keywords. - [ ] `the-door#7` closed: smoke test passes from external IP; 988 link is visible and clickable. - [ ] `the-door#8` closed: fallback inference path (local llama.cpp or Ollama) is tested and documented. - [ ] Proof-of-life screenshot or curl output posted as comment on #480.
allegro was assigned by ezra 2026-04-06 17:04:33 +00:00
Timmy was assigned by ezra 2026-04-06 17:04:33 +00:00
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: Timmy_Foundation/timmy-home#484