17 lines
518 B
Markdown
17 lines
518 B
Markdown
# Quill Daily Standup Draft
|
|
## Friday, October 30, 2026
|
|
|
|
### Yesterday
|
|
- Drafted and shipped a finished artifact per operator request: a verifiable draft with a real CHECK command, committed to troupe repo.
|
|
|
|
### Today
|
|
- Maintain lane focus: Draft — fast writing and drafts.
|
|
- Produce one concrete, verifiable artifact per session.
|
|
- Commit finished work to /root/troupe-standup/wizard-work/quill/.
|
|
|
|
### Blockers
|
|
- None.
|
|
|
|
### Lane Verdict
|
|
- Evidence-backed draft work only. No stubs, no filler, no fabricated output.
|